|
25.09.2009 Kiev-Chop highway renovation and the construction of 4 overpasses |
|
CJSC “Transmost” carries out repair work on a M06 Kiev - Chop highway in the Zhitomir region. Repair work includes the construction of overpasses number 62, 63, 64 and 65. |
more |
|
|
01.09.2009 Construction work continues on the structures in relation to Euro 2012 |
|
The work in preparation for Euro 2012 continues on various construction sites in Kiev. |
more |
|
|
01.07.2009 Reconstruction work on NSC "Olympiyskiy" |
|
CJSC Transmost is participating in the preparation of diverse sites for Euro 2012. During the renovation of NSC "Olympiyskiy", the company completed an arrangement of reinforced concrete frames for the canopy supporting steel structures. |
more |
|
|
25.06.2009 Production of reinforced concrete structures |
|
CJSC “Transmost” held a seminar during which the test on unified pretensioned concrete beams, which are manufactured at the industrial base in Chernovtsy, was made. |
more |
|
|
20.05.2009 Reconstruction of the “Paton bridge” |
|
CJSC “Transmost” takes part in the reconstruction of the transport interchange at the entrance of the “Paton Bridge” in Kiev. |
more |
|
|
21.04.2009 The President of Ukraine visits the "Transmost" faciities |
|
On April 21, 2009 the President of Ukraine, Viktor Yushchenko, inspected the construction work carried out on the bridge over r.Bystritsa and the road work at the Striy-Ivano-Frankivsk-Chernivtsi-Màmaliga highway. |
more |
|
|
02.04.2009 CJSC "Transmost" received the "Investment of the Year" award |
|
At the annual awards ceremony "Recognition-2008" which honors the best industrial companies of the region, CJSC “Transmost” was recognized as the “Investment of the Year”. |
more |
|
|
01.11.2008 CJSC "Transmost" used compact drilling rigs of UBG-L1 type |
|
Application of the foundation strengthening technology with the use of "Alligator" and "Sterkh" compact drilling rigs of UBG-L1 type allows drilling in different soils in small working areas. |
more |
|
|
25.08.2008 A bridge in the flash flood disaster area has been recovered |
|
August 25, 2008 a temporary bridge across r.Bystritsa Solotvinskaya in the Ivano-Frankivsk region has been opened. The bridge was restored a month after the flash flood disaster. |
more |
|
|
20.08.2008 The opening of new construction sites |
|
CJSC “Transmost” has received an order for the constructing and overhauling of several sites in the Ivano-Frankivsk and Lviv regions. Some of them were visited by the President of Ukraine Viktor Yushchenko. |
more |
|